Renderings Revealed for Proposed Caps Over I-75
More images can be found here at the un-paywalled article from Crains: https://archive.is/ODJY9
Reminder that this project being led by the Downtown Detroit Partnership is exploring building three caps over I-75 between midtown and downtown; one along Woodward, one along Brush, and one more along Grand River to reconnect these neighborhoods that were severed by construction of the highway in the 1950s and 1960s. It also appears from the second image they are considering making the Clifford St bridge (which runs parallel to Cass Ave) a pedestrian only crossing.